Bespoke shower glass specialists

Bespoke Shower Screens

Designed around the finished bathroom, professionally measured, drawn in CAD, manufactured to the approved specification and installed by an experienced shower-glass specialist. We manage complete bespoke projects and also offer survey-only, supply-only and installation-only services.

Over 1,000 bespoke installations Initial CAD concept before survey 12-month installation guarantee
Bespoke shower screen designed and installed around a finished bathroom
Designed before it is measured. Measured after the defining surfaces are complete. Approved before the glass is manufactured.
What bespoke really means

More than a standard screen made slightly smaller or larger

A bespoke shower screen is designed around the actual bathroom, rather than asking the bathroom to fit a catalogue product. The glass shape, door position, fixed panels, hardware, support, access and practical water control are considered together.

Bespoke glass may be needed because the walls are out of plumb, the room is narrow, the ceiling slopes, the shower sits within an attic conversion or the customer wants a cleaner and more individual design than a standard enclosure can provide.

It is not always necessary. If a suitable branded or standard shower screen will give the right result, we will say so and direct the project towards the simpler option.

The SSI definition of a bespoke shower screen

A glass screen, door or enclosure whose dimensions, shape, hardware and installation method are planned as one system around the completed shower area and the way the customer needs it to work.

Choose the right service route

Full project management or a clearly defined individual service

The fully managed route provides the strongest continuity and accountability. Survey-only, supply-only and installation-only remain available where the customer, designer or bathroom professional wants to retain responsibility for other parts of the project.

01

Survey, supply and installation

SSI develops the design, completes the survey, prepares the working drawing, supplies the glass and components, installs the screen and remains the customer’s point of contact.

  • Initial concept and approximate price
  • Professional final survey
  • Manufacturing CAD drawing
  • Glass, hardware and installation
02

Professional survey and design

A non-committal professional service for customers who want accurate measurements, a CAD drawing and component recommendations before deciding who will supply or install the glass.

  • Normally £120–£150
  • Travel and accurate measurement
  • Laser-level assessment
  • Information may be used elsewhere
03

Supply-only or installation-only

We can accept experienced third-party measurements for supply-only orders or install suitable customer-supplied bespoke glass. The responsibility boundary is agreed before the order or appointment.

  • Third-party dimensions accepted
  • Measurement risk remains external
  • Glass and components checked before fitting
  • Remedial visits may be chargeable
From idea to finished installation

The complete bespoke shower screen process

The project is divided into clear stages so the customer understands what is being proposed before paying for the final survey and what is being manufactured before the glass is ordered.

Send photos or plans

Send the layout, approximate dimensions, preferred style, project stage and postcode.

Initial assessment

We provide a simple CAD concept, recommended component list and approximate project price.

Agree the direction

The paid survey is arranged only once the customer is comfortable with the concept and likely cost.

Professional survey

The finished opening, levels, access, support and practical shower conditions are measured and assessed.

Working CAD drawing

SSI prepares the full drawing that the customer approves and the glass manufacturer builds from.

Materials ordered

The glass and material costs are paid before the approved design is released for manufacture.

Installation

The glass is checked, handled, fitted, aligned and sealed using the approved hardware arrangement.

Handover and guarantee

Operation, cleaning, maintenance and curing time are explained before workmanship cover begins.

Typical lead time: Most projects are installed approximately three to four weeks after the final survey, working-drawing approval and payment for glass and materials. Specialist finishes, component lead times or rejected glass at quality control can extend the programme.
Bespoke shower screen survey and CAD drawing
Professional survey and CAD

Measured from the finished surfaces and approved before manufacture

Final manufacturing measurements are taken once the surfaces that define the glass opening are complete. This prevents the dimensions being based on an unfinished wall, loose tray, missing stone cap or floor level that later changes.

  • Tray or bath permanently fixed
  • Tiles or wall panels complete
  • Grouting finished
  • Half walls and stone caps installed
  • Finished aperture edges complete
  • Floor level and relevant boxing established

Two drawings serve different purposes

The initial concept explains the likely design and budget. The later working CAD drawing contains the measured specification, is approved by the responsible person and is the document used by the glass manufacturer.

The best time to get involved

Early advice can prevent the bathroom being built around the wrong screen

We can begin after the bathroom is complete, but the design stage provides the greatest opportunity to improve the final result. Small changes to the tray, opening, half wall or shower-head position can make a substantial difference to door movement, support and splash control.

01

Tray or shower-floor position

The glass line should relate properly to the tray, drain and surrounding walls.

02

Door direction and clearance

Basins, toilets, radiators, slopes and narrow walkways affect how a door can open.

03

Half walls and support

The wall height, cap, fixing structure and intended glass arrangement should be planned together.

04

Shower-head position

Water direction influences door gaps, panel length, seals and the likely need for a threshold.

05

Floor falls and drainage

A floor falling away from the drain can create a problem that glass alone cannot correct.

06

Access for the finished glass

Staircases, turns, door openings and lifting routes are considered before large panels are ordered.

Glass, hardware and finishes

The specification is selected as a complete system

Glass thickness, panel size, hinge capacity, channels, clamps, support, machining and finish must all remain within the selected component manufacturer’s stated tolerances. Thicker glass is not automatically better, and thinner glass is not automatically weaker when correctly specified for the intended design.

Glass choices

Standard clear, low-iron, frosted, sandblasted, acid-etched, grey tint, bronze tint and easy-clean coating.

Hardware systems

Professional shower-glass components selected primarily from CR Laurence and Bohle ranges.

Reliable finishes

Chrome, brass, brushed brass and matt black, subject to component availability and compatibility.

Door configurations

Hinged doors, fixed panels, door-and-panel combinations, corner enclosures and bespoke sliding arrangements.

Shaped glass

Sloping tops, notches, angled returns, half-wall arrangements and complex polygon or pentagon designs.

Not currently offered

Curved glass, decorative grid systems and fluted or reeded glass are not currently part of the SSI range.

Typical applicationCommon starting rangeHow the final specification is decided
Fixed bespoke screenUsually 10mmPanel size, height, support, channels, clamps and access.
Hinged shower doorUsually 8–10mmHinge capacity, door width, weight and fixing structure.
Large walk-in panelUsually 10–12mmPanel dimensions, movement, support arrangement and carrying route.
Over-bath screenUsually 6–8mmHinge system, panel size, bath edge and intended movement.
Does the glass need support?

Support is a design decision, not an optional afterthought

Panels over approximately 900mm are normally assessed for additional support when they rely mainly on wall and floor channels. The final decision depends on glass dimensions, thickness, fixing conditions and the limitations of the selected component system.

01

Straight support arm

A direct and reliable way to restrain a larger fixed panel where the layout allows.

02

Ninety-degree wall brace

A cleaner alternative where a side wall provides the correct structure and position.

03

Ceiling clamp

Useful in selected full-height or near-ceiling designs where the structure and geometry are suitable.

04

Ninety-degree wall clamp

Can provide discreet restraint where a return wall or adjacent surface is available.

05

Channels and clamps

Wall and floor channels or point clamps may be combined according to appearance and support needs.

06

Revised panel proportions

Sometimes altering the panel size or arrangement is better than forcing unsuitable hardware into the design.

Do you really need a support arm? Not necessarily that particular arm, but larger glass may still require an appropriate form of restraint. We compare the available alternatives rather than removing support purely for appearance.
Honest water-control advice

Bespoke and frameless do not mean completely watertight

Bespoke shower glass is designed to provide practical splash control for the agreed layout. Frameless hinges, door clearances, panel gaps and seals do not create a completely sealed enclosure, and it would be misleading to promise otherwise.

01

Shower-head direction

Water aimed towards a hinge gap, door edge or opening increases the likelihood of escape.

02

Thresholds and water bars

These are assessed during survey where they would improve practical water control.

03

Floor falls

A floor falling away from the drain may require remedial work because glass cannot redirect the floor.

04

Small shower cubicles

Water is concentrated in a tight area, so compact cubicles need more careful sealing and layout decisions.

05

Door and hinge gaps

Frameless doors need working clearances. Seals can improve control but cannot remove every gap.

06

How the shower is used

Water pressure, handset use, body position and spray direction all affect real-world performance.

Finished bespoke glass shower screen installation
The best result balances appearance, access, glass support, door movement and practical splash control rather than appearance alone.
Typical installed price guides

What does a bespoke shower screen cost?

These guide ranges include glass, standard hardware and professional installation. They are not fixed tariffs. Glass size, thickness, machining, support, hardware finish, access and installation complexity determine the final quotation.

Fixed custom panel

£300–£700

Depending on size, thickness, support and machining.

Hinged shower door

£450–£750

Depending on hinge system, width, handle and seals.

Door with side panel

£550–£1,250

Depending on panel size, channels, clamps and hardware.

Corner enclosure

£900–£2,200

Depending on configuration, door system and number of panels.

Sloping or shaped enclosure

£750–£1,500

Depending on glass shape, notches, support and complexity.

Survey cost: A professional bespoke survey is normally approximately £120–£150. It includes travel, accurate measurement, laser-level checks, CAD working information and recommended glass and components. It is non-committal, and the customer may use the resulting information elsewhere.

Start with a concept and approximate price

Send photographs or plans first. We will outline the likely glass arrangement, component route and approximate cost before asking you to commit to the paid final survey.

Request an Initial Concept
Manufacture, checking and responsibility

What happens after the working drawing is approved?

Glass and material costs are paid before the approved working drawing is released for manufacture. Installation labour is paid when the fitting work is complete.

01

Manufacturing instruction

The approved CAD drawing defines dimensions, shapes, holes, notches and hardware positions.

02

Quality control

Glass that is scratched, incorrectly processed or miscut is replaced rather than installed to protect a date.

03

Replacement without extra cost

Where SSI supplies the glass, a scratched or miscut panel is replaced without additional cost.

04

Access assessment

Staircases, landings, doorways, turns and carrying routes are assessed before large glass is ordered.

05

Two-person installation

Larger or heavier panels are handled and installed by two people where required.

06

Fixed quotation

After survey and approved specification, the quotation remains fixed unless the agreed scope changes.

When SSI supplies the package, SSI accepts responsibility for it

Glass processors and component manufacturers may provide separate product warranties, and some glass guarantees effectively end at delivery. Where SSI has surveyed, specified, supplied and installed the agreed project, the customer deals with SSI rather than being left to resolve an issue between separate businesses.

Discuss Your Project
Installation and handover

The project is not finished when the glass is standing upright

The screen must be positioned, secured, adjusted, sealed and handed over correctly. The customer should understand how the doors, seals, gaskets and thresholds work before the shower is used.

Bathroom protection

The work area and relevant finished surfaces are protected before drilling and glass handling.

Glass and component check

Panels, holes, notches, edges, fittings and finishes are checked against the approved design.

Fitting and adjustment

Channels, hinges, clamps, braces, seals and doors are aligned for the intended operation.

Correct sealing

Silicone and water-control details are applied without blocking intended drainage paths.

Cleaning and operation

The customer is shown how the door works, how to clean the glass and what maintenance is required.

Twenty-four-hour cure time

The shower should normally remain unused for 24 hours after installation.

Aftercare: SSI provides a 12-month installation-workmanship guarantee. Reasonable door and hinge adjustments are covered during that period, including adjustment where rubber gaskets settle or soften over time, provided the surrounding structure and installation surfaces have not moved.
Replacing an existing screen

Removal and disposal can be added to the bespoke project

The old screen can be removed for an agreed additional cost. We remove accessible silicone and clean the fitting area before the new installation, but removal can expose conditions hidden behind the original profiles.

01

Old fixing holes

Existing holes may remain visible where the new hardware follows a different line.

02

Loose tiles or finishes

Pre-existing loose tiles or unstable finishes can appear when old profiles are removed.

03

Silicone staining

Old silicone is removed where accessible, but staining may remain in porous or aged finishes.

04

Hidden damage

SSI cannot accept responsibility for pre-existing damage that was not visible before removal.

Bespoke shower screen questions

Frequently asked questions

Clear answers about surveys, drawings, glass thickness, support, pricing, water control, lead times and responsibility.

What makes a shower screen bespoke?

A bespoke screen is designed around the actual bathroom. Its dimensions, glass shape, door position, fixed panels, hardware, support and installation method are specified together rather than selected solely from a standard product size.

Do I need to pay for a survey before receiving design advice?

No. We first review photographs, plans and approximate dimensions, then provide a simple preliminary CAD concept, recommended component route and approximate price. The paid survey is arranged only after the customer agrees with that direction.

How much does a professional bespoke survey cost?

A bespoke survey is normally approximately £120–£150. It includes travel, professional measurement, laser-level checks, CAD working information and recommended glass and components. It is non-committal and may be used with another supplier.

When can final manufacturing measurements be taken?

The surfaces defining the glass opening must be complete. This normally means the tray or bath is fixed, tiles or panels and grouting are finished, half walls and stone caps are installed and final aperture edges and floor levels are established.

Will I approve the glass before it is manufactured?

Yes. After survey, SSI prepares the detailed working CAD drawing. The responsible person approves it before ordering, and the glass manufacturer uses that approved drawing to produce the panels.

Does every bespoke shower screen use 10mm glass?

No. Ten-millimetre glass is a common starting point because it works with a broad range of components, but the glass may be thinner or thicker where appropriate. The final thickness must remain compatible with the selected hardware and manufacturer tolerances.

Do I always need a visible support arm?

Not always. Alternatives may include a ninety-degree wall brace, ceiling clamp, wall clamp, channels or revised panel proportions. Larger glass may still require an appropriate form of restraint even where a straight support arm is avoided.

Will a bespoke frameless screen be completely watertight?

It is designed for practical splash control, but frameless doors, hinge gaps and working clearances do not create a completely sealed enclosure. Shower-head position, thresholds, seals, floor falls and use all affect water performance.

How long does a bespoke shower screen take?

Most projects are installed approximately three to four weeks after final survey, working-drawing approval and payment for glass and materials. Specialist components, finishes or replacement of glass rejected at quality control can extend the timescale.

What happens if SSI-supplied glass is scratched or made incorrectly?

Where SSI supplies the glass, a scratched, incorrectly processed or miscut panel is replaced without additional cost to the customer. It is better to replace unsuitable glass than install it merely to protect an original date.

Can you supply glass using measurements taken by someone else?

Yes, where the measurements have been taken by an experienced person and the specification is clear. However, SSI cannot accept responsibility if glass ordered from third-party dimensions does not fit the completed opening.

What guarantee is included?

SSI provides a 12-month installation-workmanship guarantee, including reasonable door and hinge adjustment where appropriate. Glass and components carry their separate manufacturer or supplier warranties.

Planning a bespoke shower screen?

Send photographs, plans or approximate dimensions. We will review the project and outline the likely design, component route and approximate cost before arranging the final survey.

Send Photos or Plans
Send Plans